Import coal
2.5% basic duty, 18% IGST, compulsory CIMS registration. India imported about US$ 26.7 billion of coal in FY 2025-26.
- Basic customs duty
- 2.5% 2.5%
- Social welfare surcharge
- 10% of BCD
- IGST
- 18% 18%
- India’s imports, 2025-26
- US$ 26.7 bn from 26 countries
The tariff rate for all lines of 2701 was 5%; S. No. 86 of notification 45/2025-Customs lowered it to 2.5%, and the Finance Bill 2026 made 2.5% the tariff rate from 1 May 2026 (that S. No. was then omitted by 2/2026-Customs). Coal moved to the 18% IGST schedule from 22 Sep 2025 (notification 9/2025-Integrated Tax (Rate), Schedule II). Check the full duty on ICEGATE before you price. AIDC 1.5% on 2701 under notification 11/2021-Customs as first issued — confirm whether it still applies on ICEGATE. CBIC — Notification 45/2025-Customs (effective duty rates), 24 Oct 2025, as amended ↗
What is imported
Steel plants import coking coal, and power plants, cement, sponge iron and other industries import steam coal. Imports under 2701 were about US$ 26.7 billion in FY 2025-26, down from US$ 29.5 billion (TradeStat). Australia and Indonesia each supplied about 23%, followed by Russia, the USA and South Africa. Smaller traders usually buy from these importers at the port rather than importing whole vessels.
Free, subject to compulsory advance registration of each consignment on the Coal Import Monitoring System (CIMS) run by DGFT and the Ministry of Coal.
Licences and registrations you need
- DGFT / Ministry of Coal (CIMS)Online registration of each consignment on CIMS before arrival; the registration number goes on the bill of entry.imports.gov.in ↗
What is checked at the port
- Customs checks the CIMS registration number and the quantity against the draft survey at discharge.
- Classification between coking and steam coal is checked against the test report (ash, volatile matter, calorific value).
- Quality is usually checked by an independent surveyor at load and discharge ports for price adjustment.
Practical tips
- Buy against a written specification (GCV, ash, moisture, sulphur) with price adjustments for each parameter.
- Register on CIMS early; the system lets you register only within a set window before arrival.
- First-time buyers can start with port-based purchases from an established importer.
Where new importers go wrong
- A vessel arriving without CIMS registration — the bill of entry cannot be filed.
- Coal with higher moisture or ash than contracted and no price-adjustment clause.
Sources (9)
- CBIC — Notification 45/2025-Customs (effective duty rates), 24 Oct 2025, as amended
- Notification 2/2026-Customs (Budget amendments to 45/2025-Customs), 1 Feb 2026
- Finance Bill 2026 — Fifth Schedule (tariff rates from 1 May 2026)
- CBIC — Customs Tariff of India (as on 30.06.2025)
- Notification 11/2021-Customs — Agriculture Infrastructure and Development Cess (as first issued)
- CBIC — Notification 9/2025-Integrated Tax (Rate), 17 Sep 2025 (IGST rates from 22 Sep 2025)
- Coal Import Monitoring System (CIMS)
- Commerce Ministry TradeStat — commodity-wise imports by country (FY 2025-26)
- ICEGATE — Customs duty and tariff look-up
Import data
Where India buys coal
India’s imports from the Department of Commerce’s TradeStat, country by country. US$, financial years.
- Imports, 2025-26
- US$ 26.7 bn
- Change from 2024-25
- ↓-9.5%
- Supplying countries
- 26
- Biggest supplier
- Australia 23%
Biggest supplying countries
Which sources are growing and shrinking
↑ Growing sources
- United Arab EmiratesUS$ 520 mn → US$ 762 mn↑+46.7%
↓ Shrinking sources
- ColombiaUS$ 279 mn → US$ 138 mn↓-50.7%
- SwitzerlandUS$ 313 mn → US$ 178 mn↓-43.3%
- CanadaUS$ 417 mn → US$ 277 mn↓-33.6%
- IndonesiaUS$ 7.83 bn → US$ 6.17 bn↓-21.2%
- South AfricaUS$ 3.26 bn → US$ 2.86 bn↓-12.3%
Which forms come in, and at what price
Imports by 8-digit tariff line, 2025-26. Average price = total value ÷ total quantity.
| Tariff line | Value 2025-26 | Change | Quantity | Average price |
|---|---|---|---|---|
Coal,, whether or not pulverised but not agglomerated — coking coal2701 19 10 | US$ 11.8 bn | ↓-3.2% | 66.08 mn tonnes | US$ 0.18 per kg |
Coal,, whether or not pulverised but not agglomerated — steam coal2701 19 20 | US$ 11.7 bn | ↓-16.8% | 156.07 mn tonnes | US$ 0.07 per kg |
Other coal whether or not pulvrsd but ntagldmrtd2701 19 90 | US$ 2.8 bn | ↑-0% | 20.13 mn tonnes | US$ 0.14 per kg |
Anthrcite coal whether or not pulvrsd but not aglomrtd2701 11 00 | US$ 255 mn | ↓-15.9% | 1.86 mn tonnes | US$ 0.14 per kg |
Coal, bituminous, whether or not pulverised, but not agglomerated — bituminous coal : other2701 12 90 | US$ 212 mn | ↑+5% | 1.99 mn tonnes | US$ 0.11 per kg |
Bituminous coal : coking coal2701 12 10 | US$ 31.3 mn | ↓-58.5% | 2,47,502 tonnes | US$ 0.13 per kg |
Source: TradeStat — Export Import Data Bank, Department of Commerce · Figures taken 29 October 2026.
More in raw materials
All import guides →
Free, with conditionsRaw materialsTimber logs5% basic duty. Plant quarantine permit and fumigation are the main hurdles. Australia, Malaysia and South America lead supply.Basic duty5%IGSTCheck on ICEGAIndia imported 2025-26US$ 1.01 bn
Free, with conditionsRaw materialsWaste paper (recovered paper)Raw material for paper mills. 10% tariff duty, 2.5% for paper and newsprint mills under end-use conditions.Basic duty2.5–10%IGSTCheck on ICEGAIndia imported 2025-26US$ 1.39 bn
Free to importRaw materialsPlastic granules (polymers in primary forms)Mostly 7.5% basic duty. BIS quality control orders on PE, PP and PVC were withdrawn in Nov 2025. Anti-dumping duty on bottle-grade PET from China.Basic duty5–7.5%IGST18%India imported 2025-26US$ 11.6 bn
Free, with conditionsRaw materialsSteel sheets and coils (flat-rolled)7.5% basic duty plus an 11.5% safeguard duty until 20 Apr 2027. BIS licence and SIMS registration are compulsory.Basic duty7.5–15%IGST18%India imported 2025-26US$ 2.78 bn